Completed Projects List


The L. Feriozzi Team has been involved in a wide variety of projects and brings extensive expertise in various roles as indicated in the following categories:

Airport


2011
Atlantic City International Airport – Construction of N & S Arm/Disarm Aprons – Pomona, New Jersey
Subcontractor for A. E. Stone, Inc.
Subcontract Amount - $400,000.00


2010
Atlantic City International Airport – Apron Expansion – Phase 1B – Pomona, NJ
Subcontractor for A. E. Stone, Inc.
Subcontract Amount – $659,600.00

2009
Atlantic City International Airport – Apron Expansion – Phase 1 – Pomona, NJ
Subcontractor for A. E. Stone, Inc.
Subcontract Amount - $735,852.00

2000 - 2001
Atlantic City International Airport – Runway 13-31 Rehabilitation – Pomona, NJ
Subcontractor for A. E. Stone, Inc.
Subcontract Amount - $1,328,765.00

1998
FAA Tech Center Pavement Test Facility – Atlantic City International Airport – Pomona, NJ
Subcontractor for DMJM / Cornell, Joint Venture
Subcontract Amount - $74,800.00

1993
Atlantic City International Airport – Construction of Parking Lot #3 – NJ
Subcontractor for Remington & Vernick, P.E.
Subcontract Amount - $65,000.00


Bank


2006
Boardwalk Bank – Branch Office – Ocean Heights Avenue – Egg Harbor Township, NJ
Subcontract Amount - $144,820.00

2005
Boardwalk Bank – Branch Office – Middle Township, NJ
Subcontract Amount - $127,240.00

2005
Boardwalk Bank – Branch Office – English Creek Avenue – Egg Harbor Township, NJ
Subcontract Amount - $109,450.00


Boardwalk Bank – Branch Office – Margate, NJ
Subcontract Amount - $146,480.00

2003
Boardwalk Bank – Branch Office – Galloway, NJ
Subcontract Amount - $71,820.00


Boardwalk

2015  
Alterations & Additions @ Boardwalk & Montpelier Avenue - Atlantic City, New Jersey
General Contractor
Contract Amount - $138,096.00


2010
Wildwood Boardwalk Reconstruction – Wildwood, NJ
General Contractor
Contract Amount - $1,667,978.00

2005
Ocean City Boardwalk Repairs – 5th Street to 12th Street – City of Ocean City, NJ
General Contractor
Contract Amount - $305,268.00

1996
Boardwalk Reconstruction from Pennsylvania Ave. to NJ Ave. & Arkansas Ave.
Atlantic City, NJ
General Contractor
Contract Amount - $814,516.00

1994
Boardwalk Reconstruction from Arkansas to Missouri Avenues & Georgia to California Avenues
General Contractor - City of Atlantic City, NJ
Contract Amount - $815,648.00

1994
Storm Damaged Atlantic City Boardwalk Repair – Oriental to Pacific & Grammercy to Madison
General Contractor - City of Atlantic City, NJ
Contract Amount - $326,005.00

1989
Atlantic City Boardwalk Reconstruction – Atlantic City, NJ
General Contractor
Contract Amount - $646,000.00

1980
Atlantic City Boardwalk Reconstruction – Atlantic City, NJ
General Contractor
Contract Amount - $315,000.00

1996
Reconstruction of Boardwalk Concrete Girders – Atlantic Avenue to Madison Avenue
Atlantic City, N. J.
General Contractor
Contract Amount - $517,480.00


Casino/Hotel


2008
Chelsea Hotel – Atlantic City, NJ
James Simpkins Project Manager for Bertino & Associates
Construction Management/General Construction
Contract Amount - $35,000,000.00

2008
Trump Taj Mahal – Tower Superstructure – Atlantic City, NJ
Subcontractor for Bovis Lend Lease LMB, Inc.
Subcontract Amount - $35,131,124.00

2007
Trump Taj Mahal – New Hotel Tower Foundation – Atlantic City, NJ
Subcontractor for Bovis Lend Lease LMB, Inc.
Subcontract Amount - $3,329,600.00

2006
Borgata North Expansion – Concrete & Underslab Methane Venting System – Atlantic City, NJ
General Contractor
Contract Amount - $9,277,849.00

2006
Borgata North Expansion Egress – Atlantic City, NJ
Subcontractor for MDDC, L.L.C.
Subcontract Amount - $628,042.00

2006
Harrah’s Human Resource Center & Parking Lot – Atlantic City, NJ
Subcontractor for Massett / Bertino, Joint Venture
Subcontract Amount - $300,000.00

2006
Harrah’s Human Resource Center – Atlantic City, NJ
James Simpkins Project Manager for Massett/Bertino, Joint Venture
Construction Management/General Construction
Contract Amount - $13,000,000.00

2005
Burgundy Motor Inn – Atlantic City, NJ
General Contractor
Contract Amount - $347,640.00

2005
Fairfield Skyline Tower Resort – Atlantic City, NJ
Subcontractor for Torcon, Inc.
Subcontract Amount - $213,269.00

2003
The Borgata Casino – Concrete on Metal Deck & Slab on Grade – Low Rise & Garage – NJ
General Contractor
Contract Amount - $22,666,908.00

2002
Tropicana Porte Cochere Renovations – Atlantic City, NJ
Subcontractor for Keating Building Corporation
Subcontract Amount - $477,000.00

2002
Bally’s Claridge Connector – Atlantic City, NJ
James Simpkins Project Manager for Massett/Bertino, Joint Venture
Construction Management/General Construction
Contract Amount - $25,000,000.00

2001
The Borgata Casino – Foundation – Huron North Redevelopment Avenue – Atlantic City, NJ
Subcontractor for Yonkers / Granite, Joint Venture
Subcontract Amount - $3,538,955.00

2000
Sands Casino Hotel – Pacific Avenue Expansion Project – Atlantic City, NJ
Subcontractor for Massett Building Company
Subcontract Amount - $303,731.00

2000
Bally’s Wild Wild West Casino Expansion Project – Atlantic City, NJ
Subcontractor for Keating / Massett, Joint Venture
Subcontract Amount - $750,163.00

1998/1996
Renovation of Resorts Hotel/Casino – Atlantic City, NJ
James Simpkins Superintendent for Keating Building Corporation
Construction Management/General Construction
Contract Amount - $54,000,000.00

1996
Harrah’s Casino Expansion Project – Phase I – Atlantic City, NJ
General Contractor
Contract Amount - $2,561,147.00

1996
Bally’s Park Place Casino Resort – Western Theme Casino Expansion / Foundations – Atlantic City, NJ
Subcontractor to Network Construction Company, Inc.
Subcontract Amount - $986,387.00

1996
Hilton Tower Expansion – Atlantic City, NJ
James Simpkins Project Manager for Perini Corporation
Construction Management/General Construction
Contract Amount - $80,000,000.00

1995/1996
Trump Plaza East Tower Expansion Project – Atlantic City, NJ
Subcontractor to Claremont / NFF – Joint Venture
Subcontract Amount - $589,641.00

1987/1990
Trump Castle Expansion – Phase II – Atlantic City, NJ
Subcontractor for Lehrer McGovern Bovis – Philadelphia, Pennsylvania
a. Tower Superstructure - $2,700,000.00
b. Tower Site Work - $110,000.00
c. Marina Site Work - $1,300,000.00
d. Marina Concrete - $550,000.00
e. Foundation Concrete - $1,100,000.00
f. Marine Police Building Foundation - $72,000.00

1988/1989
Tropicana South Tower & Tivoli Pier Expansion – Atlantic City, NJ
James Simpkins Superintendent for Perini Corporation
Construction Management/General Construction
Contract Amount - $135,000,000.00

1986/1987
Resorts International (Taj Mahal) Superstructure – Structural Steel & Concrete – Atlantic City, NJ
Subcontractor for Resorts - Joseph LePari
Subcontract Amount - $30,000,000.00

1986/1987
Tropicana Superstructure and Sitework – Atlantic City, NJ
Subcontractor for Perini Corporation
Subcontract Amount - $13,000,000.00

1986/1987
Showboat Casino/Hotel – Atlantic City, NJ
James Simpkins Superintendent for Perini Corporation
Construction Management/General Construction
Contract Amount - $142,000,000.00

1986
Trump Castle Superstructure and Sitework – Atlantic City, NJ
Subcontractor for Tishman Construction Company – New York
Subcontract Amount - $11,000,000.00 (Phase 1)

1982/1984
Trump Plaza Hotel & Casino – Atlantic City, NJ
James Simpkins Superintendent for Perini Corporation
Construction Management/General Construction
Contract Amount - $152,000,000.00

1982/1984
Trump Plaza Hotel & Casino – Hi-Rise / Low-Rise / Sitework – Atlantic City, NJ
General Contractor
Contract Amount - $11,872,000.00

1982/1984
Trump Plaza Hotel & Casino – Atlantic City, NJ
James Simpkins Superintendent for Perini Corporation
Construction Management/General Construction
Contract Amount - $152,000,000.00

1982
Claridge Hotel/Casino – Atlantic City, NJ
James Simpkins Superintendent for Del E. Webb Corp.
Construction Management/General Construction
Subcontract Amount - $92,000,000.00

1981
Golden Nugget Superstructure (Hilton) - Atlantic City, NJ
Subcontractor for Tishman Construction Company – New York
Subcontract Amount - $9,000,000.00

1980
Bally’s Park Place Superstructure – Phase 1 – Atlantic City, NJ
Subcontractor for Turner Construction Company – New York
Subcontract Amount - $13,000,000.00


Education


2016  
Stair & Elevator Replacement Project – Richard Stockton College of New Jersey – Galloway, New Jersey
General Contractor
Contract Amount - $2,128,149.00


2013  
B & F Wings Roof Replacement - Richard Stockton College of New Jersey - Galloway, New Jersey
General Contractor
Contract Amount - $1,010,271.00


2012
Renovation of J & H Wings – Richard Stockton College of New Jersey – Pomona, New Jersey
General Contractor
Contract Amount - $1,796,365.00


2012 
West Quad Alterations – Richard Stockton College of New Jersey - Pomona, New Jersey
General Contractor
Contract Amount - $224,241.00


2003
Seaview School Parking Improvements – Linwood, NJ
Subcontractor for West Bay Construction, Inc.
Subcontract Amount - $56,045.00

1999/2000
Chelsea Heights Elementary School - Addition – Atlantic City, NJ
General Contractor
Contract Amount - $1,751,625.00

1998
Multipurpose Recreation Center – Phase I – The Richard Stockton College of NJ
General Contractor
Contract Amount - $365,492.00

1994/1996
K-4 Elementary School – Brigantine Board of Education - Brigantine, NJ
General Contractor
Contract Amount - $7,480,980.00

1993
Stockton State College – Geothermal Installation – NJ
Subcontractor for HEATAC Systems – Lester, Pennsylvania
Subcontract Amount - $550,000.00

1992/1993
Atlantic City High School / Earthwork & Surcharge (#2) – A.C. Board of Education, NJ
General Contractor
Contract Amount - $6,113,000.00

1992
Stockton State College – Landfill Closure
General Contractor – State of NJ
Contract Amount - $120,000.00

1991/1992
Egg Harbor Township Middle School – Egg Harbor Township, NJ
General Contractor
Contract Amount - $1,379,000.00

1990
Mainland Regional High School – Linwood, NJ
Subcontractor for Perini Corporation
Subcontract Amount - $430,000.00

1990
Mainland Regional High School – Linwood, NJ
James Simpkins Project Manager for Perini Corporation
Construction Management/General Construction
Contract Amount - $22,000,000.00


Entertainment


2013 
Resorts Margaritaville - 5 O'Clock Somewhere Bar, Land Shark & Grill / Topping - Atlantic City, New Jersey
Subcontractor for Massett Building Company
Subcontract Amount - $668,175.00

2005
The 40 / 40 Club – Atlantic City, NJ
Subcontractor for Tishman Corporation of NJ
Subcontract Amount - $224,358.00

2004
Jewish Community Center - Margate, NJ
James Simpkins Project Manager for Massett/Bertino, Joint Venture
Construction Management/General Construction
Contract Amount - $7,000,000.00

1985
Boardwalk Hall Historic Renovation – Atlantic City, NJ
James Simpkins Project Manager for Perini Corporation
Construction Management/General Construction
Contract Amount - $22,000,000.00

1993
Renovation of Garden Pier – Civic & Art Centers – City of Atlantic City, NJ
General Contractor
Contract Amount - $4,097,394.00



Environmental


2014   
Repairs to Bulkhead - Brigantine, New Jersey
General Contractor
Contract Amount - $435,644.70


2010
Lower Cape May MUA Solar Array – Lower Township, NJ
General Contractor
Contract Amount - $88,000

2010
Revel Central Energy Center – Atlantic City, NJ
Subcontractor for DCO Energy, LLC
Subcontract Amount - $964,724.00

1996
Midtown Thermal Control Center – Atlantic City, NJ
Subcontractor to Air Science Corporation
Subcontract Amount - $696,882.00


Hospital


2000
Burdette Tomlin Memorial Hospital – Emergency Dept. & Radiation / Oncology – Expansion / Renovation
Cape May Court House, NJ
Subcontractor for Turner Construction Company
Subcontract Amount - $266,803.00

1995
Shore Memorial Hospital – Emergency Room Expansion – Somers Point, NJ
Subcontractor to John S. McQuade Company
Subcontract Amount - $55,850.00

1995
Community Medical Center – O.R. Expansion – Toms River, NJ
Subcontractor to M. Kowalchick & Associates, Inc.
Subcontract Amount - $178,930.00

1991/1992
Burdette Tomlin Memorial Hospital – Phase II – NJ
Subcontractor for Turner Construction Company
Subcontract Amount- $286,000.00


Industrial


2011
Virtua West Jersey Hospital – Site Lighting – Voorhees, New Jersey
Subcontractor for Petrocelli Electric
Subcontract Amount - $487,285.00


2000
Burdette Tomlin Memorial Hospital – Emergency Dept. & Radiation / Oncology – Expansion / Renovation
Cape May Court House, NJ
Subcontractor for Turner Construction Company
Subcontract Amount - $266,803.00

1995
Shore Memorial Hospital – Emergency Room Expansion – Somers Point, NJ
Subcontractor to John S. McQuade Company
Subcontract Amount - $55,850.00

1995
Community Medical Center – O.R. Expansion – Toms River, NJ
Subcontractor to M. Kowalchick & Associates, Inc.
Subcontract Amount - $178,930.00

1991/1992
Burdette Tomlin Memorial Hospital – Phase II – NJ
Subcontractor for Turner Construction Company
Subcontract Amount- $286,000.00


Industrial


2009
Aggregate Unloading System – A. E. Stone Plant – Egg Harbor Township, NJ
General Contractor
Contract Amount - $364,768.50

2003
Cumberland TruStone Manufacturing – Vineland, NJ
James Simpkins Project Manager for Bertino & Associates
Construction Management/General Construction
Contract Amount - $4,000,000.00


Institutional


2015 
Alterations & Renovations to Back Corridor - Bacharach Institute for Rehabilitation - Pomona, New Jersey
General Contractor
Contract Amount - $130,000.00


2013
Bacharach Institute for Rehabilitation - Dining Room & Corridor Renovations - Pomona, New Jersey
General Contractor
Contract Amount - $134,621.00


2011
Bacharach Institute – “A” Wing Renovations – Pomona, New Jersey
General Contractor
Contract Amount - $619,888.00


2008
Delaware Correctional Facility 600 Cell Expansion – Smyrna, DE
James Simpkins Project Manager for Keating Building Corporation
Construction Management/General Construction
Contract Amount - $60,000,000.00

1993/1994
Curran-Fromhold 1000 Cell Correctional Facility – Philadelphia, PA
James Simpkins Superintendent for Perini/Tri-State Joint Venture
Construction Management/General Construction
Contract Amount - $100,000,000.00

1991/1992
Somerset 1000 Cell Correctional Facility – Somerset, PA
James Simpkins Superintendent for Perini/P.J. Dick Joint Venture
Construction Management/General Construction
Contract Amount - $110,000,000.00


Parking Garage


2015 
New York Avenue Parking Garage Facade Improvements - Atlantic City, New Jersey
General Contractor
Contract Amount - $806,889.00


2012
A.C. Corridor - Christopher Columbus Mixed-Use Parking Garage (The Wave) – Atlantic City, NJ
General Contractor
Contract Amount - $30,142,933.00

2011
Borgata North Expansion – Employee Parking Garage #3 – Atlantic City, NJ
Subcontractor for Baumgardner Construction Company, Inc.
Subcontract Amount - $968,031.00

2008
Borgata Water Club – Parking Garage – Atlantic City, NJ
Subcontractor for Baumgardner Construction Company, Inc.
Subcontract Amount - $1,502,636.00

2006
Caesars Transportation Center – Atlantic City, NJ
Subcontractor for Massett / Bertino, Joint Venture
Subcontract Amount - $11,042,362.00

2006
Caesars Transportation Center – Atlantic City, NJ
James Simpkins Project Manager for Massett/Bertino, Joint Venture
Construction Management/General Construction
Contract Amount - $78,000,000.00

2003
Borgata Employee Parking Garage – Atlantic City, NJ
Subcontractor for Baumgardner Construction Company, Inc.
Subcontract Amount - $685,247.00

1995/1996
Claridge Parking Garage – Atlantic City, NJ
James Simpkins Superintendent for Perini/Nugent Joint Venture
Construction Management/General Construction
Contract Amount - $24,000,000.00

1996
Golden Nugget Parking Garage – Phase 1 – Atlantic City, NJ
General Contractor
Contract Amount - $11,000,000.00

1987
Claridge Parking Garage Superstructure – Structural Steel & Concrete – Atlantic City, NJ
Subcontractor for Mullock Construction Company – Pittsburgh, Pennsylvania
Subcontract Amount - $3,450,000.00

1987/1990
Resorts International (Taj Mahal) – Performed 90% of Concrete Work for Garages – Low
Rises & Superstructure
Atlantic City, NJ
Subcontractor for Resorts and Perini Corporation
Subcontract Amount - $25,000,000.00


Residential


2009
Swimming Pool Renovations – 5000 Boardwalk Condominiums – Ventnor, NJ
General Contractor
Contract Amount - $132,720.00

2008
Pleasant Woods – Phase II – Egg Harbor Township, NJ
General Contractor
Contract Amount - $102,045.00

2007
Preconstruction Development – Coachman’s Condo/Hotel – Cape May, NJ
James Simpkins Project Manager for Bertino & Associates
Construction Management
Contract Amount - $4,000,000.00

2001
Preconstruction Condo/Hotel Development – Packard Building, Philadelphia, PA
James Simpkins Project Manager for Dwyer Construction
Construction Management
Contract Amount - $100,000,000.00

2000
Expansion of Flanders Condo/Hotel, Ocean City, NJ
James Simpkins Project Manager for Dwyer Construction
General Construction
Contract Amount - $3,000,000.00

2000
Preconstruction Condo/Hotel Development – Former Jewish Federation, Philadelphia, PA
James Simpkins Project Manager for Dwyer Construction
Construction Management
Contract Amount - $20,000,000.00


Restaurant


2003
The Babalu Café – Atlantic City, NJ
Subcontractor for Tishman Construction Corporation of NJ
Subcontract Amount - $32,445.00

2003
Rainforest Café – Trump Plaza – Atlantic City, NJ
Subcontractor for Baumgardner Construction Company, Inc.
Subcontract Amount - $111,775.00


Retail


2014   
Tenant Fit-Out @ The Wave Garage - Atlantic City, New Jersey
General Contractor
Contract Amount - $1,623,251.00


2000
Preconstruction Development – Linwood Business Campus, Linwood, NJ
James Simpkins Project Manager for Dwyer Construction
Construction Management
Contract Amount - $100,000,000.00

1999
Vision 2000 / Retail & Apartment Units – Atlantic City, NJ
Subcontractor for the Delta Organization, Inc.
Subcontract Amount - $107,250.00

1990
Circuit City Superstore – Shore Mall – Egg Harbor Township, NJ
Subcontractor for R.J. Kroener, Inc.
Subcontract Amount - $118,000.00


Road Work


2016     
Improvements Of 200 Block 8th Street South – Brigantine, New Jersey
General Contractor
Contract Amount - $174,473.00 


2015  
Pacific Avenue Resurfacing Phase "A" - Atlantic City, New Jersey
General Contractor
Contract Amount - $3,239,165.00


2015  
Pacific Avenue Resurfacing Phase "B" - Atlantic City, New Jersey
General Contractor
Contract Amount - $2,268,489.00


2014   
Route 322 @ Weymouth Road - Folsom, New Jersey  
Subcontractor for A. E. Stone, Inc.
Subcontract Amount - $63,902.00


2013   
Reconstruction of Arctic Avenue - Atlantic City, New Jersey
Subcontractor for South State, Inc.
Subcontract  Amount - $121,787.00


2013 
Pacific Avenue Streetscape - Phase V - Wildwood, New Jersey
General Contractor
Contract Amount - $442,972.50


2012
Reconstruction of Rosborough Avenue – Ventnor, New Jersey
General Contractor
Contract Amount - $164,544.00


2012
South Inlet Transportation Improvement Project – Atlantic City, New Jersey
General Contractor
Contract Amount - $24,517,552.00


2012
Reconstruction of Monmouth Avenue – Ventnor, New Jersey
General Contractor
Contract Amount – $205,444.05


2012
Revel Casino – Roadwork – Atlantic City, New Jersey
Subcontractor for Tishman Construction Corporation of New Jersey
Subcontract Amount - $3,515,785.00


2011
Martin Luther King, Jr. Boulevard Widening Project – Atlantic City, New Jersey
General Contractor
Contract Amount - $750,292.00


2010
Sheridan Place Sidewalks – Brigantine, NJ
General Contractor
Contract Amount - $65,915.00

2010
Reconstruction of Bayview Avenue – Pleasantville, NJ
General Contractor
Contract Amount - $84,917.00

2010
Roadway & Sewer Improvements Baton Rouge Ave. & Troy Ave – Ventnor, NJ
General Contractor
Contract Amount - $297,185.00

2010
Beach Avenue Phase 1 – Cape May, NJ
General Contractor
Contract Amount - $621,891.00

2009
Franklin Boulevard Roadway Improvements – Pleasantville, NJ
Subcontractor for A. E. Stone. Inc.
Subcontract Amount - $99,188.00

2008
Improvements to Monmouth Avenue – Phase II – Ventnor, NJ
General Contractor
Contract Amount - $136,232.00

2007
Shore Road – Sections 4 and 5 – Pleasantville, NJ
Subcontractor for A. E. Stone, Inc.
Subcontract Amount - $495,165.00

2007
Capital Roadway Program – Ventnor, NJ
General Contractor
Contract Amount - $307,726.00

2006
Reconstruction of Monmouth Avenue – Margate, NJ
General Contractor
Contract Amount - $520,329.00

2006
Rehabilitation of Main & Mill Streets – Phase 1 – Hamilton Township, NJ
General Contractor
Contract Amount - $654,760.00

2006
Stabilization of Jobs Point Bridge – Egg Harbor Township, NJ
Subcontractor for A. P. Construction, Inc.
Subcontract Amount - $102,737.00

2003
Absecon Boulevard & North Carolina Avenue Improvements – Atlantic City, NJ
General Contractor
Contract Amount - $8,198,818.00

1999/2000
Improvements to Virginia Avenue – Route 30 to Pacific Avenue – Atlantic City, NJ
General Contractor
Contract Amount - $2,874,204.00

2000
Improvements to Mississippi Avenue – Atlantic City, NJ
General Contractor
Contract Amount - $423,478.00

1999
Tropicana Neighborhood Beautification – Phase II – Roadway Intersection – Atlantic City, NJ
General Contractor
Contract Amount - $527,093.00

1996/1997
Local Road Program 1996 – Various Streets – City of Margate City, NJ
General Contractor
Contract Amount - $422,911.95

1997/1998
Reconstruction of Arctic Avenue & Various Streets – Atlantic City, NJ
General Contractor
Contract Amount - $430,563.00

1997/1998
Atlantic City Convention Center Corridor Project
Phase IIb Streetscape – Atlantic Park & Plaza / Headquarters Hotel – Atlantic City, NJ
General Contractor
Contract Amount - $8,108,431.00

1996
Reconstruction of Granville & Gladstone Avenues – City of Margate, NJ
General Contractor
Contract Amount - $438,586.00

1994
Chelsea Neighborhood Streetscape Beautification – City of Atlantic City, NJ
General Contractor
Contract Amount - $407,930.00

1993/1994
Atlantic County Improvement Authority
Delaware Avenue Widening & Absecon Boulevard Realignment – Atlantic City, NJ
General Contractor
Contract Amount - $3,081,181.00

1991
Reconstruction of Ventnor Avenue – Margate, NJ
General Contractor - County of Atlantic
Contract Amount - $747,000.00 (Includes $ 20,000.00 Incentive Bonus)

1991
Reconstruction of Vermont & Melrose Avenues – City of Atlantic City, NJ
General Contractor
Contract Amount - $530,000.00

1991
Reconstruction of New Hampshire Avenue – City of Atlantic City, NJ
General Contractor
Contract Amount - $2,088,000.00


Site Work


2014   
Lake Lenape Park East - ADA Renovations - Phase II - Mays Landing, New Jersey 
General Contractor
Contract Amount - $2,503,208.00


2013
Stone Harbor Beach Ramps - Stone Harbor, New Jersey
Subcontractor for Arthur R. Henry, Inc.
Subcontract Amount - $197,135.00


2013
Poplar Avenue Pedestrian Safety Improvements - Linwood, New Jersey
General Contractor
Contract Amount - $169,180.75


2013 
ADA Compliant Beach Access Improvements @ Various Locations - North Wildwood, New Jersey
General Contractor
Contract Amount - $320,160.48


2013 
Beach Access Stairways @ Various Locations - Longport,  New Jersey
General Contractor
Contract Amount - $83,070.00


2013 
Expansion of Seawall Promenade at Hereford Avenue - North Wildwood, New Jersey
General Contractor
Contract Amount - $67,930.00


2013 
Pinnacle Lot Site Improvements - Phase I - Atlantic City, New Jersey
General Contractor
Contract Amount - $1,932,490.00


2013 
Wood Pedestrian Handicapped Ramp Dune Crossovers - Stone Harbor, New Jersey
Subcontractor for Arthur R. Henry, Inc.
Subcontract  Amount - $214,932.00


2009
Linwood Arboretum – City of Linwood, NJ
General Contractor
Contract Amount - $159,193.00

2008
Borgata North Tower – Sitework – Atlantic City, NJ
Subcontractor for Joseph Jingoli & Son, Inc.
Subcontract Amount - $161,764.00

2003
Borgata Ring Road – Civil Site Work – Contract 11 – Atlantic City, NJ
Subcontractor for Joseph Jingoli & Son, Inc.
Subcontract Amount - $732,908.00

1999
Bay Avenue Redevelopment & Roadway Reconstruction – City of Somers Point, NJ
General Contractor
Contract Amount - $824,771.20

1998
Brighton Avenue Surface Parking Facility – Tropicana Casino & Resort – Atlantic City, NJ
General Contractor
Contract Amount - $870,900.00

1998
Caesar’s – Regency Building Sitework – Atlantic City, NJ
Subcontractor for Morse Diesel / Weatherby Construction
Subcontract Amount - $887,000.00

1996/1997
Atlantic City Convention Center Corridor Project – Phase I Streetscape – Atlantic City, NJ
General Contractor
Contract Amount - $2,347,900.00

1993
Atlantic County Improvement Authority – A.C. Convention Center / Site Preparation #5 – NJ
General Contractor
Contract Amount - $841,653.00


Substation


2016   
Cedar Substation “A” – Stafford Township, New Jersey
General Contractor
Contract Amount – $217,533.00


2016    
Cedar Substation “B” – Stafford Township, New Jersey
Subcontractor for Arthur R. Henry, Inc.
Subcontract Amount - $580,709.00


2016     
Lewis Substation (Phase 3) – Pleasantville, New Jersey
Subcontractor for Arthur R. Henry. Inc.
Subcontract Amount - $347,300.00


2016     
Mill Substation – McKee City, New Jersey
General Contractor
Contract Amount - $376,874.50
  
2015  
Corson Substation - Cape May Courthouse, New Jersey
Subcontractor for Arthur R. Henry, Inc.
Subcontract Amount - $44,900.00


2015  
Court Substation - Cape May Courthouse, New Jersey
Subcontractor for Arthur R. Henry, Inc.
Subcontract Amount - $68,825.00


2015  
Higbee Substation - Atlantic City, New Jersey
Subcontractor for Arthur R. Henry, Inc.
Subcontract Amount - $255,800.00


2015  
Huron Substation - Atlantic City, New Jersey
Subcontractor for Arthur R. Henry, Inc.
Subcontract Amount - $113,315.00


2015 
Lewis Substation - Pleasantville, New Jersey
Subcontractor for Arthur R. Henry, Inc.
Subcontract Amount - $432,889.00


2015  
Mickelton Substation - Gibbstown, New Jersey
Subcontractor for Arthur R. Henry, Inc.
Subcontract Amount - $1,631,380.00


2015  
Missouri Substation - Atlantic City, New Jersey
Subcontractor for Arthur R. Henry, Inc.
Subcontract Amount - $49,400.00


2015  
Searstown Substation - Cardiff, New Jersey
General Contractor
Contract Amount - $292,497.00


2015 
Sicklerville Substation - Sicklerville, New Jersey
Subcontractor for Arthur R. Henry, Inc.
Subcontract Amount - $146,900.00


2014   
Franklin Substation - Below Grade Construction - Franklinville, New Jersey
Subcontractor for Arthur R. Henry, Inc.
Subcontract Amount - $1,681,598.00


2014   
Lake Substation - Wildwood, New Jersey  
Subcontractor for Arthur R. Henry, Inc.
Subcontract Amount - $48,620.00


2014   
Lewis Substation - Egg Harbor Township, New Jersey
Subcontractor for Arthur R. Henry, Inc.
Contract Amount - $174,500.00


2014   
Marven Substation - Margate, New Jersey
Subcontractor for Arthur R. Henry, Inc.
Contract Amount - $1,912,359.00


2013  
Carll's Corner Substation - Bridgeton, New Jersey
Subcontractor for Arthur R. Henry, Inc.
Subcontract Amount - $112,000.00


2013 
Minotola Substation - Below Grade Construction - Minotola, New Jersey
General Contractor
Contract Amount - $895,000.00


2013 
Moss Mill Substation - Below Grade Construction - Pomona, New Jersey
Subcontractor for Arthur R. Henry, Inc.
Contract Amount - $820,530.00


2013 
Quinton Substation - Below Grade Additions - Quinton, New Jersey
General Contractor
Contract Amount - $285,000.00


2012 
Egg Harbor City Substation - Foundations – Egg Harbor, New Jersey
General Contractor
Contract Amount - $485,463.00


2012  
Woodstown Substation - Foundations – Woodstown, New Jersey
General Contractor
Contract Amount - $277,227.00


2009
Lake Avenue Substation – Wildwood, NJ
General Contractor
Contract Amount - $140,700.00

2009
B. L. England Substation – Demolition & Installation of Concrete Foundations - Beesley’s Point, NJ
General Contractor
Contract Amount - $45,950.00

2009
Orchard Substation – Transformer Sound Wall Foundations – Upper Pittsgrove Township, NJ
General Contractor
Contract Amount - $255,437.00

2009
Lake Avenue Substation – Civil Additions – Wildwood, NJ
General Contractor
Contract Amount - $113,000.00

2009
Sickler Substation – Civil Additions – Sicklerville, NJ
General Contractor
Contract Amount - $194,995.00

2007
Barnegat Substation – Foundations – Barnegat, NJ
General Contractor
Contract Amount - $233,500.00

2007
Dennis Substation – Foundations – Dennisville, NJ
General Contractor
Contract Amount - $1,142,662.00

2007
Lincoln Substation – Foundations – Vineland, NJ
Cardiff Substation – Foundations – Cardiff, NJ
General Contractor
Contract Amount - $863,493.00

2004
Merion & Ship Bottom Substations – Conectiv – Merion (Ocean City) & Ship Bottom, NJ
General Contractor
Contract Amount - $1,526,387.00

2004
Middle Substation – Tank Foundation – Conectiv – Rio Grande, NJ
General Contractor
Contract Amount - $86,120.00

2003
Cardiff Substation – Cardiff, NJ
Subcontractor for Overland Contracting, Inc.
Subcontract Amount - $352,205.00

2002
Huron Substation Pile Cap Construction – Conectiv – NJ
Subcontractor for Overland Contracting, Inc.
Subcontract Amount - $225,063.00

2002
Lake Avenue Substation - Below Grade Additions – Conectiv – Wildwood, NJ
General Contractor
Contract Amount - $180,608.00

2001/2002
Cape May Substation – Below Grade Additions - Conectiv - Cape May Court House, NJ
General Contractor
Contract Amount - $284,983.00

2002
Huron Substation – Civil Additions - Atlantic City, NJ
General Contractor
Contract Amount - $1,496,500.00

2001
Pleasantville, South Millville & Swainton Substations – Below Grade Additions – NJ
General Contractor – Conectiv Power Delivery
Contract Amount - $246,706.00


Transit


1995/1996
NJ Transit Bus Maintenance Facility – Egg Harbor Township, NJ
Subcontractor to Dick / Baumgardner – Joint Venture
Subcontract Amount - $2,200,407.00

1989/1990
NJ Transit – Rail Platforms - Structural Steel & Concrete - A.C. Line – NJ
General Contractor
Contract Amount - $1,840,000.00


Utilities


2014  
Dennis Transformer Storage Foundations - Dennis Township, New Jersey   
General Contractor
Contract Amount - $511,012.00


2012
ACR Inlet District Energy Center (IDEC) – Atlantic City, New Jersey
Subcontractor for DCO Energy, LLC
Subcontract Amount - $1,267,302.00


2012
ACR Inlet District Energy Center (ACI – CHP) – Atlantic City, New Jersey
Subcontractor for DCO Energy, LLC
Subcontract  Amount - $264,491.00


2001
Atlantic City / Brigantine Connector (Tunnel) – Pump Station Concrete – NJ
Subcontractor for Joseph Jingoli & Son, Inc.
Subcontract Amount - $676,191.00

2000
Renovation of Rotating Biological Contractor Facility – Cape May County M.U.A. – NJ
Subcontractor for Roger W. Wuestefeld, Inc.
Subcontract Amount - $225,902.00

1999/2000
AT&T Cable Landing Station Addition – Tuckerton, NJ
Subcontractor for Turner Construction Company
Subcontract Amount - $1,467,272.00

1999/2000
Relocation of Huron Ave Pump Station & Sewerage Force Main – AC Tunnel – NJ
Subcontractor for Lafayette Utility Construction Company
Subcontract Amount - $443,230.00

1991
Atlantic County Utilities Authority – Construction of Clarifier #F6 & Substation #3 – NJ
Subcontractor for Creamer Brothers, Inc.
Subcontract Amount - $731,000.00

1990
Brigantine Well House Construction
General Contractor - Doran Engineering – Pleasantville, NJ
Contract Amount - $267,000.00